Supervising the implementation of the dualization of Najran/Sharurah/Al-Wadiah (Al Khazrah/Sharurah) road and some subsidiary and secondary roads in the Najran region.

Project Information (Scope of Work) :
  • Dualization of the Najran/Sharurah/Al-Wadia (Al Khazrah/Sharurah) road with a length of (50) km (Third Phase) from station (108+00) to station (158+00).
  • The road that connects the intersection of Al-Khadra with Najran / Sharurah road to Al-Husniya with a length of (50) km.
  • Completion of the extension of Khabash Governorate with a length of (9) km.
  • Implementation of the dualization of the Najran/Sharurah/ Al-Wadia road with a length of (59) km (Fourth Phase).
  • Roads and Transport Department building in Najran region.
  • Completion of the Roads and Transport Department building in the Najran region.

Duration of the Project :
36 Months

The value of implementation contracts within the agreement :
284،003،944.26 Saudi Riyal.

Project value :
7,303,032 Saudi Riyal.

Route lengths :
168.009 km

Basic Services :
Supervise implementation.

Sector :
Roads, Bridges and Tunnels.

Services provided :
Supervision of construction works - Surveying works - Engineering design review - Road design - Structural designs - Hydrological studies - Geotechnical studies - Quality assurance / Quality control - Project and Construction Management.

Work Site :
Najran region.

Owner of the Project :
Ministry of Transportation (MOT).

Project Start Date : 01/01/1432 H
Porject End Date   : 30/03/1435 H